My current knitting projects have been in a weird state for the last few weeks. They all ended up in time-out or on hold for various reasons at about the same time, and they're all now back into an active state. I think I've spent an equal amount of time on all 3 of them over the last week, which is odd for me. I usually like to have one main project to focus on and a few fallback projects.
I finished purple sock 1 of 2 on Saturday night, and I cast on the second sock on Sunday.
I decided I do like the cast-on for my colorful striped socks, so they've been living in my purse and getting worked on while I wait for various things, like dinner.
I came up with what I think is a brilliant time-saver for my sweater. On the final purl row before separating the sleeves, I used the hole in my interchangeable needles to thread in a "life-line". I then cut it in half (mid-back), removed it from the front/back sections, and left it just in the sleeve sections. Ta-da! The sleeves were all set on waste yarn with very little effort on my part.
Now that I've got a few rows of the body, I need to knit my sweater onto a longer cable tonight and try it on.
Monday, September 29, 2014
Sunday, September 21, 2014
the sweater - fixing a mistake
I was super happy with my sweater progress. I managed to finish an entire ball of Cascade 220 Superwash in 5 days while on vacation. When we got home, I joined the second ball of yarn and knitted it onto a longer cable to try it on ... and noticed I had completely messed up one of my raglan increases 8 rows back (it veers off to the left at the marker). This is not a mistake I can live with.
First things first, the sweater went into time-out. I was upset, and that is no time to be trying to fix a mistake that involves increases. The brain is a wonderful thing, and within a few days I had a plan of attack for how to fix my mistake.
Some of the tactics I used:
1. I specifically picked Sunday, early afternoon, when the sun is at its best in my living room. I have a nice light carpet to use as a background for the dark yarn. I put on the Oakland Raiders game so there was something in the background, but nothing I actually needed to watch (they lost, again).
2. I used a size 1 circular (recently freed from a sock, so it was easy to grab) instead of a lifeline to mark a good row.
3. I used some size 4 dpn's (again, recently used and easy to grab) instead of size 7's (which is the needle size I'm using for the sweater). I put one in place for exactly the stitches I intended to rip down to, which was one row above the "lifeline". I selected 4 good stitches and got a second opinion.
4. I followed those edge stitches up and placed markers on my cable so I knew which stitches I would be dropping. That was 12 stitches. I used a fresh size 7 circular to knit up to the first marker and then dropped the 12 stitches.
5. This is my favorite idea that I came up with - I used a hair clip to get all of those squigly bits of yarn out of the way. I just left the one strand of yarn I was using free for each row.
6. I carefully knit across using the size 4 dpn's, making absolutely sure I got my increases right this time. At the end of each "row", I had enough yarn left over that it was still easy to work, and then I carefully redistributed the yarn back across the row so the stitches were even. Since I was using dpn's, I could knit every row instead of turning and purling. (increase row, knit plain row, repeat). There's still a but of unevenness at the edges of the drop section, but I'm pretty sure it will block out.
7. We celebrated with chocolate (for me only) and by watching the San Francisco 49'ers game (which was going really well until the second half).
First things first, the sweater went into time-out. I was upset, and that is no time to be trying to fix a mistake that involves increases. The brain is a wonderful thing, and within a few days I had a plan of attack for how to fix my mistake.
Some of the tactics I used:
1. I specifically picked Sunday, early afternoon, when the sun is at its best in my living room. I have a nice light carpet to use as a background for the dark yarn. I put on the Oakland Raiders game so there was something in the background, but nothing I actually needed to watch (they lost, again).
2. I used a size 1 circular (recently freed from a sock, so it was easy to grab) instead of a lifeline to mark a good row.
3. I used some size 4 dpn's (again, recently used and easy to grab) instead of size 7's (which is the needle size I'm using for the sweater). I put one in place for exactly the stitches I intended to rip down to, which was one row above the "lifeline". I selected 4 good stitches and got a second opinion.
4. I followed those edge stitches up and placed markers on my cable so I knew which stitches I would be dropping. That was 12 stitches. I used a fresh size 7 circular to knit up to the first marker and then dropped the 12 stitches.
5. This is my favorite idea that I came up with - I used a hair clip to get all of those squigly bits of yarn out of the way. I just left the one strand of yarn I was using free for each row.
6. I carefully knit across using the size 4 dpn's, making absolutely sure I got my increases right this time. At the end of each "row", I had enough yarn left over that it was still easy to work, and then I carefully redistributed the yarn back across the row so the stitches were even. Since I was using dpn's, I could knit every row instead of turning and purling. (increase row, knit plain row, repeat). There's still a but of unevenness at the edges of the drop section, but I'm pretty sure it will block out.
7. We celebrated with chocolate (for me only) and by watching the San Francisco 49'ers game (which was going really well until the second half).
Tuesday, September 9, 2014
sweater the second
Something went click in my brain when I actually completed my first sweater and realized it actually fits. I wanted to try knitting another one :) I did a bunch of brainstorming while I was on-call on Saturday and came up with what I wanted to do. A quick trip to Purlescence later, and I had my yarn and was casting on. This one will be a cardigan, because that is something I wear all the time. I did just enough rows to set myself up for airplane/travel knitting. My project page on Ravelry.
Oh, and my knitting model is back. I missed her.
Oh, and my knitting model is back. I missed her.
Saturday, August 30, 2014
my knitting model is on vacation
OMG, I finished a sweater! And in less than 30 days. This is the first sweater I've ever finished.
Unfortunately, my normal knitting model is currently on vacation, so you'll have to put up with a bad photo of me instead. Ravelry link.
The ends have all been woven in now, and it's ready to be washed and blocked tomorrow (Saturday).
---
After a horrible week, I think the ants might be under control. I worked a 16-hour day on Wednesday and came home to find them everywhere. I left yet another message for my spray company. They called back Thursday morning and said they would go under the house to spray. I took a quick shower, packed up Callie, and took her over to my parents' house. I'm still finding a few ants, but I've been promised they should all be gone by the end of the weekend. The house smells pretty bad, and I know it makes Callie sick, so she gets to stay with my parents for a few days.
Unfortunately, my normal knitting model is currently on vacation, so you'll have to put up with a bad photo of me instead. Ravelry link.
The ends have all been woven in now, and it's ready to be washed and blocked tomorrow (Saturday).
---
After a horrible week, I think the ants might be under control. I worked a 16-hour day on Wednesday and came home to find them everywhere. I left yet another message for my spray company. They called back Thursday morning and said they would go under the house to spray. I took a quick shower, packed up Callie, and took her over to my parents' house. I'm still finding a few ants, but I've been promised they should all be gone by the end of the weekend. The house smells pretty bad, and I know it makes Callie sick, so she gets to stay with my parents for a few days.
Tuesday, August 26, 2014
things could be better
My sweater is currently in time-out. We had a bad mishap on Sunday night. I don't think it's ruined, but I'm still really upset. It's my own fault. I couldn't even bring myself to look at it last night.
This week is not starting out well at all. Yesterday was a lousy day at work, and this morning I woke up to find ants in the living room and the kitchen. I'm dreading what I will find when I get home from work today.
In hopes of making myself feel better and give myself something look forward to, I sent an email to Purlescence Yarns to check on the new Cascade Heritage Prints sock yarn that should be arriving soon. I made a list of the colorways I must have:
08 Cotton Candy
12 Spring Bouquet
05 Frosty Morn
13 Nightfall
04 Iris
02 Pop
01 Hawks
16 Summertime
This week is not starting out well at all. Yesterday was a lousy day at work, and this morning I woke up to find ants in the living room and the kitchen. I'm dreading what I will find when I get home from work today.
In hopes of making myself feel better and give myself something look forward to, I sent an email to Purlescence Yarns to check on the new Cascade Heritage Prints sock yarn that should be arriving soon. I made a list of the colorways I must have:
08 Cotton Candy
12 Spring Bouquet
05 Frosty Morn
13 Nightfall
04 Iris
02 Pop
01 Hawks
16 Summertime
Sunday, August 24, 2014
sweater progress
I really wanted to finish my sweater this weekend, but it's just not going to happen. This weekend has been filled with work and a very needy lap-cat. I should be able to finish it this week. The body is done, and I started on the first sleeve.
My recovery from surgery is progressing well. I'm back up to being able to walk a full 2 miles.
My recovery from surgery is progressing well. I'm back up to being able to walk a full 2 miles.
Friday, August 8, 2014
I might be a little crazy
I can knit a sweater in 30 days, right? It's t-shirt sized, in sock yarn, on size US 7 needles. I might be a little crazy.
This all started when I saw another sweater featured by WEBS, and I realized I really want something I can wear next month in Minneapolis. My wardrobe is just fine for Silicon Valley, but I'm pretty sure adults my age in other states don't wear gamer/printed t-shirts out to family dinners. After a hunt on Ravelry, I selected this sweater: http://charlypopette.blogspot.fr/2012/10/tuto-du-pull-grasshopper.html
I used google translate on it, and I think I can mostly figure it out. Now to see if I can find yarn for it and complete it before we leave.
This all started when I saw another sweater featured by WEBS, and I realized I really want something I can wear next month in Minneapolis. My wardrobe is just fine for Silicon Valley, but I'm pretty sure adults my age in other states don't wear gamer/printed t-shirts out to family dinners. After a hunt on Ravelry, I selected this sweater: http://charlypopette.blogspot.fr/2012/10/tuto-du-pull-grasshopper.html
I used google translate on it, and I think I can mostly figure it out. Now to see if I can find yarn for it and complete it before we leave.
Subscribe to:
Posts (Atom)













