My current knitting projects have been in a weird state for the last few weeks. They all ended up in time-out or on hold for various reasons at about the same time, and they're all now back into an active state. I think I've spent an equal amount of time on all 3 of them over the last week, which is odd for me. I usually like to have one main project to focus on and a few fallback projects.
I finished purple sock 1 of 2 on Saturday night, and I cast on the second sock on Sunday.
I decided I do like the cast-on for my colorful striped socks, so they've been living in my purse and getting worked on while I wait for various things, like dinner.
I came up with what I think is a brilliant time-saver for my sweater. On the final purl row before separating the sleeves, I used the hole in my interchangeable needles to thread in a "life-line". I then cut it in half (mid-back), removed it from the front/back sections, and left it just in the sleeve sections. Ta-da! The sleeves were all set on waste yarn with very little effort on my part.
Now that I've got a few rows of the body, I need to knit my sweater onto a longer cable tonight and try it on.
No comments:
Post a Comment